Capitol Hill Wind Farm

NJ Construction successfully completed the design and installation of Transmission lines at the Capitol Hill Wind farm site near Bungendore, NSW. The value of the project was $4.5 Million.

The activities included detailed design and construction of a new twin circuit Transmission line, and tie in to existing substation lines.

The site was challenging with significant rock and steep terrain. The site was also Environmentally sensitive and a detailed Environmental Plan was prepared to Address construction practices to ensure minimal disturbance along the route.

This project was delivered on time with no Non Conformance’s.

Key project

facts

  • Design and Construct
  • Environmentally Sensitive conditions
  • Zero Quality Non Conformance
  • 33kV twin circuitĀ overheadĀ  infrastructure
  • The conductor and OPGW were installed utilizing tension stringing techniques